Clients / Projects

Wastewater Treatment and Disposal

Picture
Asti Winery, Beringer Wine Estates
Cloverdale
Domestic wastewater treatment and disposal studies; general plant civil engineering consulting.
Contact: Al Burns, Facilities Engineer, Beringer Wine
707.963.7115 (TEL)


Irrigation Reservoir

Picture
Bluerock Vineyards
Alexander Valley

20+ acre-ft. off-stream irrigation reservoir.
Contact: Kenny Kahn, Owner
415.383.7041 (TEL)


Feasibility Study for Expansion

Picture
Buena Vista Vineyards, Allied Domecq Wines, USA
Carneros
60 acre-foot irrigation reservoir at Buena Vista Vineyards.
Contact: Pete Opatz, Director of Viticulture
707.484.5482 (TEL)

Feasibility study for the expansion of Buena Vista Winery.                                     
Contact: Dick Osborn, Architect
707.542.3770 (TEL)

Utility Improvements and Treatment Pond Enlargement

Picture
Chateau St. Jean Vineyards & Winery
Kenwood

Feasibility study of process waste treatment pond upgrading; planning, plan production and engineering consulting for additional plane and utility improvements and treatment pond enlargement.
Contact: Bill Preston, Plant Manager
707.833.4134 (TEL)


Site Development

Picture
Clos du Bois Winery
Geyserville

Civil engineering design for site development 1990 - 2010. Project included design of grading, drainage, utilities, driveway, parking lot, and ADA compliance.
Contact: Thomas B. Hobart, former Senior Vice President, Allied Domecq Wines, USA
707.431.1640 (TEL)


60,000 - Case Winery Development

Picture
The Donum Estate
Carnaros Region, Sonoma County

Civil engineering consultation on development of a proposed 60,000 case winery, including phase 2 at 120,000 cases.
Contact: Anna Moller-Racke, Manager
707.939.2295 (TEL)


5,000 - Case Winery Devevopment

Picture
Dutcher Crossing Winery
Dry Creek Valley
Civil engineering consultation on development of a new 5,000-case winery.
Contact: Bruce Nevins, Proprietor
707.433.6565 (TEL)


Percolation Testing and Septic System

Picture
Ferrari-Carano Vineyards & Winery
Healdsburg

Percolation testing and septic system plan production for 38-person farm labor housing facility.
Contact: Steve Dominicelli, Vineyard Manager
707.433.6700 (TEL)


Winery Expansion

Picture
Flowers Vineyards & Winery
Cazadero

Civil engineering consultation on Phase 2 development.
Contact: Walt Flowers, Owner
707.847.3661 (TEL)


Design of 24 Matheson Street Frontage and Site Improvements

Picture
The Frandsen Building
Healdsburg

Project consisted of utility design, surface grade design, design of frontage improvements, and parking lot design.  As a gravity connection to the City sewer main was not possible, a pump station and force main were installed withing a new easement to rectify the issue.  (In conjunction with EBA Engineering.)

Civil Engineering for Farm Labor Housing

Picture
Gauer Estate Vineyards
Geyserville

Civil engineering for farm labor housing on Geysers Road.
Contact
Tel



Crush Area and Barrel Cellar Expansion

Picture
J Wine Company
Location
Civil site work engineering for crush area and barrel cellar expansion.    
Contact: Dana Diluvio, Facility Manager
707.431.5405 (TEL)


Design of Tasting Room and Access Driveway

Picture
John Tyler Wines
Healdsburg
Conducted design for utilities, grading and drainage for the site at 4151 Westside Road in Healdsburg.  Completed in 2010, the components of this large project included ADA accessibility, driveway design, and retaining wall design for the tasting room structure.
Contact John Bacigalupi, Owner.  (707) 433-0123

Roads, Irrigation Reservoirs and Septic

Picture
Jordan Vineyards & Winery
Alexander Valley

Civil engineering design of winery roads, irrigation reservoirs, and septic system designs for winery expansion.
Contact: Mason Ainsworth, General Manager
707.431.5295 (TEL)


10,000 Square Foot Cave

Picture
Lancaster Estate Vineyards
Healdsburg

Land planning; developed use permit and civil engineering for 10,000 sf cave for barrel storage.
Contact: David Elliott, Winemaker
707.433.8178 (TEL)


78-Lot Residential Development

Picture
Los Robles Estates Subdivision
Location
Civil engineering for 78-lot single-family home development.
Contact
Tel



Comprehensive Site Development

Picture
Merry Edwards Wines
Russian River Valley

Civil engineer for site development, 2004 to present.
Contact: Merry Edwards & Ken Coopersmith
707.838.9950 (TEL)


Full-scope Planning

Picture
Montemaggiore Winery
Dry Creek Valley
Full-scope planning and civil engineering services for 5,000-case estate winery.
Contact Vincent & Liza Ciolino
707.433.9443 (TEL)


5,000 - Case Winery

Picture
Mounts-Amphora Winery
Dry Creek

Civil engineering consultation on development of 5,000-case winery.
Contact Richard Mounts, Proprieter
707.433.4102 (TEL)


Sediment, Erosion Control and Wastewater Treatment

Picture
RidgeLytton Vineyards
Healdsburg

Develop sediment and erosion control plans for new vineyards on Norton Ranch in Sonoma County; design and permit for new process wastewater treatment lagoons at winery.
Contact: Mark Vernon or David Gates
408.690.1103 or 408.690.1106 (TEL)


Grading, Drainage and Utility Plans

Picture
The Shed Project
Healdsburg

Grading, drainage and utility plans for propsed new sidewalks fronting North Street, and ADA access to building front. Set finished grades on all surfaces with corner geometry at Foss and North Street intersection with revised manhole lid covers. Utility design to conform to comments by  mechanical consultant, plumbing consultant and City of Healdsburg comments. (In conjunction with Curtis & Associates.)

New 12,500 - Case Winery

Picture
Stuhlmuller Vineyards
Alexander Valley

Civil engineering consultation on development of a new 12,500 case winery.
Contact: David Collin, Vineyard Manager
707.431.7099 (TEL)


Design and Construction Support Services for Subdivision

Picture
T-T Subdivision
Geyserville

Performed construction management services including bid soliciting, contractor selection, executing the construction contract, designing and implementing traffice control devices and detour routes to limit impact on businesses beyond the construction site.

Site Work, Utility and Grading

Picture
TreMonte Winery (Ferrari-Carano)
Geyserville

Civil site work, utility and grading engineering for new 25,000 sf barrel cellar; use permitting; process wastewater treatment pond enlargement.
Contact: George Bursick, Winemaster or Bill Moon, Maintenance Superintendent
Tel


Grading, Drainage and Utilites

Picture
Valley of the Moon Winery (Kenwood Vineyards)
Glen Ellen

Site work civil plans for grading, drainage and utilities for planned improvements to accommodate 100,000 case production.
Contact: Patrick Hamilton or Mike Lee
707.833.5891 (TEL)


Design of Production Facility, Tasting Room and Administration Building

Picture
William Selyem Winery
Healdsburg
Performed civil engineering design for a new facility at 7227 Westside Road, Healdsburg.  Completed in 2010, the project consisted of three structures for winery operations and tasting.  The design included grading, drainage, utility develpment, sewage disposal, ADA accessibility and road encroachment.
Contact: Chuck Gangnath, Facilities Superintendent. (707) 431-3722 (TEL)

Farm Labor Housing, Septic, Drainage and Irrigation Plans

Picture
Vino Farms, Inc.
Lodi
Site assessment for farm labor housing; percolation testing; septic system plan design; labor housing grading and drainage plans; irrigation pond plan; vineyard sediment and erosion control plans.
Contact: Jim Ledbetter, Owner
209.334.6975 (TEL)                               


Land Planning, Perc Testing, Utility Development, Road Plans

Picture
Webber Subdivision
Location

Civil engineering consultation on rural large, four-lot custom development; land planning, percolation testing, utility development, road plans.
Contact: Jeffery T. Webber
707.433.4227 (TEL)